Back to sorting the sidings out on my 00 gauge layout. More wiring is needed, in fact a lot more wiring as this shot shows - 24 wires!
I am soldering the wires along with the rails to the copper clad sleepers - makes sense to combine one soldered joint.
Before soldering the rails and wires I applied PVA glue where the track would lie.
I did manage to solder three of the tracks - its slow work!
To ensure the glued track stays in place a few weights were added and the load spread over the track with some scrap pieces of plywood.
Hopefully the rest of the soldering should be finished in the next day or so then it is onto the four loops at the back of the board.
No comments:
Post a Comment