Search this blog

Saturday, October 4, 2025

Tunnels and frowns - all in a day working on my Last Great Project layout!

After a day of smiles at the Rocks By rail Museum my face frowned a bit as I got back into the Man Cave to progress the bridge build for my Last Great Project Layout. Having got the bridge structure right I need to get a top on it and that will also incorporate the tunnel mouths into th storage loops. I know what I want shape wise and a top has been cut out.

My Last Great Project,

I then cut out a 'trial' set of tunnel mouths.

My Last Great Project,

Whilst it looks right to me the central pier is catching on passing trains so I will have to see if there is a way of keeping that pier or having to make the tunnel mouth a single four track one rather than two two track ones. Lots of frowning will be going into that decsion!

No comments:

Post a Comment