Search this blog

Tuesday, September 16, 2025

Brickwork butchery!

Whilst waiting for the glue to dry on my ballasting job from yesterdays post, I needed something else to do so I commenced demolishing a wall! Not on Mrs. Woody's list but never the less a job that needs to be done. WMD Towers has a bow window. A bow window is different from a bay window in that whilst the bay window is constructed from the ground up the bow window is just a window frame that looks like a bay window but without the brickwork underneath, Back in 2004, to hide the ugly wooden supports and the less then perfect brickwork I constructed a false bay window brickwork as well as a porch (which is still fine as it had deep foundations!). It did the job until in 2016 with the draught, the clay that the foundation stands on dried out more than usual and the false wall started to lean forward. I had not tied the wall into the existing brickwork deliberately because I always suspected there may be an issue and I did not want the false wall pulling on the main structure. Now that was either good planning or just an excuse for not digging deep enough foundations. However when I say the WMD Towers foundations go down 5 feet you ay understand why I did not follow with the false wall! What started as a slight lean has progressed over the years so it is time to demolish and rebuild! You can see the gap in between the window sills and the brickwork showing just how much the wall was leaning.

Bow window project

A carful use of hammer and cold chisel has seen brickwork butchery progress!

Bow window project

Despite calling it brickwork butchery, I have only broken two bricks for which the WMD Stores have spares so most will be reused once I sort out the foundation!

Bow window project


No comments:

Post a Comment