Lets start today with a bike ride which took me past a certain canal that I have posted about previously. My last post highlighted that the canal was back to normal with water filling it from bank to bank. I was therefore somewhat taken aback, as no doubt loyal blog reader Mrs. B will, that the previous trickle of a stream had returned leaving an expanse of mud and a stranded boat!
I have no idea why this has happened again as I thought that all the repair works had been done. I will visit again!
Meanwhile my visit to the Man Cave saw the wiring of the baseboard that I am working on just about finished!
Whilst not being over pedantic about neatness in the wiring I have tried to keep it organised and tidyish!
This is where all the wires will join onto the control panel when it is eventually built! There are a lot of wires and there are three other baseboards so that control panel will need to be fairly large!
The point motors all have their own wiring using a 3 cabled ribbon wire that has made that job a lot easier!
I need to finish a few jobs on the rail alignment up top and then I might just run some trains - if it all works of course!
Mrs B is indeed taken aback. Plug in. Plug out. 😮
ReplyDeleteMrs B