With the wall section off the layout for cables to be attached and weathering plus finishing off a few other parts to it you can see it is a sizable piece of infrastructure!
It is 6 foot in length and any work on it takes time dealing with that size of modelling.
However, the two cables are in place and weathering is now to commence which should be fun with something this big!
No comments:
Post a Comment