That is one track matter and cycling is another where I am tracking my mileage as I always do. With the warmish weather over the last few days I have managed 49 miles this weekend which is a good start to February bring the months total up to 60miles. Looking back through my blog I can see January this year was better than last month with 267 miles as opposed to 207 last year but a far cry from the 360miles I did in January 2022. I knew this blog had a use!
The other track matter is related to my 00 gauge Last Great Project layout. Having done a fair amount of track setting, wiring and ballasting last year on the viaduct section, the layout has not really progressed much in the last few months. I spent the last part of 2023 bringing Chalkdon my 009 layout to a near finish so time for the 00 gauge layout was limited. The start of this year saw me scratch an itch to glue plastic together so the Italeri Kangaroo and the Trumpeter L/15 Mörser "Bär" have occupied most of January. And, sometimes it is like that - you have to be in the right mood and frame of mind to move on with a project and I am now in that zone with my 00 gauge layout. I have started to sort out the circuit's passing loop and sidings. They were laid very roughly to shape and the trains did run but before I start to wire it, make the breaks in the track at base board joints and ballast the track it needs to be just right! So lots of measuring and looking at odd angles to see the curves and straights with some new pieces of track being fitted to make it flow properly and hopefully enable the trains to run without derailments!
You have to start somewhere and taking apart what is there is the start.
With some careful measurements I ahve managed to get the right geometry to the track.
No comments:
Post a Comment