Search this blog

Wednesday, August 14, 2024

Things move on!

Things move on! Firstly the turret of the Tiger 1 tank kit by Dragon is coming together with work on adding the various details and hatches. There are a lot of parts!

Dragon Tiger tank

Plumbing in the kitchen rebuild has been going on with pipes installed for the sink and washing machine. 

Kitchen rebuild,

The plaster board on the back wall was in such bad condition that the best thing to do was rip it off and reboard it. The plasterer will find it easier and quicker to skim new boards rather than patch in multiple holes and dents in old boards. Having ripped off the plaster board, Phil the builder revealed the horror of what lies under it. Not a great stud wall which literally had been thrown together by the looks of it. Phil was going to get some timber to strengthen it all but luckily WMD Stores had some in stock so that saved some time!

Kitchen rebuild,

It certainly looks better for it.


Kitchen rebuild,

Hopefully tomorrow things move on further with the electrician coming. Wonder what he will find!

No comments:

Post a Comment