Why I always seem to choose the hottest of weeks to start on a major physical project is a question that I cannot answer but it always seems to happen! At the moment I am building a monster of a log store for WMD HQ. Now I understand whilst I refer to it as a monster to some others who have large log storage requirements it may be seen as just a piffling small store but it is double the size of my present one, which at 20 plus years old is about to collapse! I also have piles of logs and timber for burning all over the place so hopefully it will all be able to be gathered in this store and kept dry.
Anyway, on the basis that I will use what I have, much of the stock of timber that I saved from other projects has gone into this one. The photo below shows the base which is 4 x 2 inch timber salvaged from the shuttering to the base of my Man Cave. I knew it would come in useful and with the price of timber these days its saved enough to be not so guilty about that next train!